Projects
California
Sacramento County
Sac. Municipal Utility District (SMUD) as off-taker (CA-Iso project)
Rancho Seco 2
160 MWAC of fixed tilt
Currently under construction
Kern County
SoCal Edison as off-taker (CA-ISO project)
Willow Springs 1
125 MWAC of tracker
230 KVA substation with 8 mile gen-tie
Structure used- NexTracker
Complete
North Rosamond
150 MWAC of tracker
230 KVA substation with shared facility agreement
Structure used- NexTracker
Complete
Monterey County
PGE as off-taker (CA-ISO project)
CA Flats
280 MWAC of tracker
Two 230 KVA substations and one switchyard.
Structure used- ExoSun- Arcelor Metal
Complete
Fresno County
PGE as off-taker (CA-ISO project)
Little Bear 1-5
160 MWAC of tracker in development
Two 115 KVA substations
Structure used- First Solar Tracker
In Development
North Star Solar
60 MWAC of tracker
115 KVA substation
Structure used- First Sola
Kings County
PGE as off-taker (CA-ISO project)
American Kings
120 MWAC tracker
70 KVA substation
Structure used- NexTracker
in Development
Mojave County
SoCal Edison as off-taker (CA-ISO project)
Windhub A
40 MWAC of tracker
66 KVA substation
Structure used- NexTracker
Mobilizing for construction
Los Angles County
Roof-top and Carport (behind/net metering)
Cal-Tech Institute of Technology
1.5 MWAC
8 sites
Lake Elsinore School District
4.5 MWAC
1 reclaimed landfill
7 school sites
Long Beach Unified School District
3 MWAC
20 school sites
Roof-top and Carport (behind/net metering)
Cal-Tech Institute of Technology
1.5 MWAC
8 sites
Lake Elsinore School District
4.5 MWAC
1 reclaimed landfill
7 school sites
Long Beach Unified School District
3 MWAC
20 school sites
SoCal Edison as off-taker (CA-ISO project)
Antelope Valley Solar Ranch
50 MWAC of tracker
Structure used- First Solar
Imperial Valley
SDPGE as off-taker
Imperial Solar Energy Center South
150 MWAC of fixed tilt system
230 KVA of substation
SoCal Edison as off-taker
Solar Gen
Three 40 MWAC tracker system
Three 115 KVA substations
Structure used- First Solar fixed tilt
Utah
Iron County
Rocky Mountain Power as off-taker
Cove Mountain 1 and 2
130 MWAC
NexTracker product
Nevada
Moapa Paiute Tribal Nation
LADWP as off taker (CA-ISO project)
Moapa Solar
250 MWAC of tracker
550 KVA substation with 11-mile gen-tie
Structure used- Fixed tilt- OMCO cartridge with TerraSmart post design
Nye County
Valley Electric as off-taker (CA-ISO project)
Sunshine Valley
100 MWAC of tracker
138 KVA substation
Structure used- NexTracker
Currently in construction
Clark County
Switch data center as off-taker. Through NV Energy
Playa 1 and 2 Solar
220 MWAC of tracker
230 KVA substation
Structure used- First Solar
Training along CA/Nevada border on fixed tilt site
Arizona
Yuma County
APS as off-taker
Agua Calliente
As Assistant Construction Manager
280 MWAC of fixed tilt
220 KVA substation
Structure used- First Solar fixed tilt
Maricopa County
APS as off-taker
APS Paloma
20 MWAC of fixed tilt
Structure used- First Solar